It's cold, but we're going to go ahead and sheath and house wrap my custom pole barn. We're building a custom pole barn on my property. Today, we're going to go ahead and sheet it and put house wrap around it. Should be pretty simple and straightforward. But what isn't straightforward is this barn. I'm doing the majority of the work. I drew it up on SketchUp. It's a one of a kind.

Plans for my pole barn: Pole Barn 28x32 plans

Why OSB on a pole barn

It's commercial framing, bookshelf framing. All the framing on the building are within the post, which makes it stronger, more efficient, and honestly, in the long run, I think cheaper.

So, OSB, it's going to make my building stronger. Most pole barns aren't built with this. They usually slap the steel on the outside. I'm kind of building this barn like a house.

Look at this. You got all this 2x6 all inside this big old 6x6, right? All 5 1/2 inch lumber. Almost 1/2 inch OSB. This is why the structure is going to be super strong.

Materials

  • OSB, 4 foot by 8 foot panels (almost 1/2 inch)
  • 2 inch framing nails, galvanized, hot dip
  • House wrap
  • House wrap nails (I think they're 1 inch)
  • House wrap tape (they sell this stuff at Menards with the house wrap)
  • A few screws to hold the sheets up while you nail

Tools

  • DeWalt battery framing gun
  • Circular saw
  • Kreg Rip-Cut
  • Tape measure
  • Level
  • Drill (a hole in each corner of the window openings)
  • 4 and 1/2 inch blade saw for the window cutouts (a router cutout bit did not hold up)
  • DeWalt FlexVolt battery
  • StackTech storage

Step 1: Lay out the first course, horizontal

We're going to use 2 inch nails using the DeWalt framing gun. I thought about this a couple different ways. I can either go vertical with the OSB. It's 4 foot by 8 foot panels. Or I can go horizontal. And I think I'm going to go horizontal and I'm going to split the difference right here. This is two foot on center. So down to the bottom, it'll get me right at concrete level. So it should make the building nice and tight.

We're going to start down at this end because 8 foot on center is that pole and that pole. Long story short is I put two screws on both sides just right above the crack. That should get me about center on that 2x6. Now I'm going to bring this to the end but not overlap it at all. Just like that. And we'll just nail it.

I probably should get a level across there. This line right here is two foot on center. So if my studs are right like I did when I built it, I should hit them. Yep, definitely hit it. Pretty solid.

What we'll do is I'll put the screws on real quick. That way I can hold the sheet up and get the next sheet attached. I think the hardest part is just remembering where you nailed and where you didn't nail. Sold on the gun. It's awesome.

Step 2: Measure, cut and stagger the upper panels

Then we'll measure this. 50 and 5/8. I'm going to set my saw to about a 1/2 inch. Maybe cut a little bit of the 2x8 underneath here. We'll put the blue end, the factory end, on the corner just to make it look like I look like a pro when I'm not.

And we'll actually stagger those upper panels, too. We'll go the opposite way. It's not hard.

Step 3: The second wall and the Kreg Rip-Cut

I'm going to knock this wall out on fast mode, just because it's just like that one. The only difference is I'll put two sheets on top of each other and then I'll have to put a sliver up there, too. So a little bit more cutting, especially the long ways. This is all 8 foot on center, two foot on center going upward.

New tool alert. I'm not sure if it's new or not. I think I've had it for about 9 months. The Kreg Rip-Cut. I thought, this is a good time to try it. All it does is ride alongside the plywood at 20 inches.

Are you kidding me? It's straight as an arrow. I mean, that is super straight. It makes it not so painful, especially an 8 foot distance like this. Who needs a table saw? Kreg stuff is awesome. Good quality stuff. All this time I've had that tool. I never used it.

Step 4: The front of the barn and the angled cuts

Next day, and it's super cold. We're going to move on to the front of the barn. I need 37 inches pretty much on both sides. So, I got the old rip saw, my new favorite tool of all times out. I got a screw down below. Hopefully gets me in the zip code up here.

Putting the panel like this shows you a good idea how square a building is. The treated reveal from this side to the blue is right on the money from top to bottom.

For that little spot up there, I measured up to the top of the rafter on this side and the top of the rafter on that side. I got 22 inches and 38 inches. So it's just a matter of me marking the panel. 22 and then the opposite side 38. That will give me my angle. Just connect the dots at this point. I'll have to hand cut this.

The middle should be fairly easy, but same process. You take your high measurement, your low measurement, cut right. Cut less than you really need, because the gap doesn't matter, because we get siding.

Step 5: The back and the rest of the OSB

Moving to the back. I need to move essentially the line I had when I did a big long wall. I just line the top right there with that. It should be perfect. Then we'll level the rest.

It's been 10 days or so. We all went through this cold snap around here, and obviously snow. I want to knock out the rest of the OSB today. Same process as we did the sides, for the most part. We'll cut the windows out after the fact. I may not cut those out until I'm ready to house wrap, just for speed to get these boards up. We're using 2 inch framing nails, galvanized, hot dip, all that good stuff. I'm using my new battery DeWalt framing gun. Pretty simple.

I used pieces at the very top just because I didn't want to waste a full sheet on some stuff that I could piece together. Last four pieces. Be careful up here. It's kind of slippery.

This is exactly why you pay the money to get done right from the get-go. Look at this. It is right on the money. I'm looking down on the wall, too. It's straight as an arrow.

Step 6: Window cutouts

I simply just drill a hole in each corner of the opening. I started with a router cutout bit. Wasn't very good. Smoked it probably in the first window. The tool that actually stole the show, 4 and 1/2 inch blade, a handsaw. It worked great up there.

OSB is done. Seemed like it took forever. But don't have much scrap, for the most part. Building still pretty square.

Step 7: House wrap

I've never done house wrap in my entire life, which is kind of odd. How hard could this be?

Let me show the nails I'm using. It's not anything special. I think they're 1 inch. The nails are fairly inexpensive, and they seem like they're going to hold better. I can see why they staple. The nails are going to be a pain. But at the end of the day, it's my barn and I want it done right.

I learned if you pull it tight and try to get that top done, and then try to keep that roll stabilized, you can get it smoothed out pretty good. It went on pretty nice, actually. It's going to be a slow process. I know why people use the three foot length ones instead of the nine. That's a sail, basically, on a boat.

Let me show you the trick. It's real simple. You hold it like this, in between two fingers. You nail it. Don't hit your fingers. And then that should make it stick. And then you just finish it up, getting your fingers out of the way. No one's ever going to see this once it's up and once the siding's on.

They sell this stuff at Menards with the house wrap. So you buy their stuff, I guess it's supposed to work good. But I think any kind of tape of this sort will probably work fine. Just keep the draft down.

On that long side, keep in mind we're putting a big header there with rafter tails. So I'm not concerned about it not being to the top. Mainly because there's a 2x10 or 12 going to go on top of that right there. Plus there's already a header behind it.

The finished sheathing and wrap

So we got her done. The OSB's on. The house wrap's on. All I have to do is cut out the openings between the windows, but I'll do that at a later date.

At the end of the day, the building's still pretty square. The OSB laid really well. The house wrap was a little pain by yourself with the wind, but I got it knocked out. It looks good. I'm happy with it.

Next up, we're going to do the rafter tails and knock out the rest of the overhangs. Then we're ready for roofing.

Time and cost

The big question is, how much did it cost me and how long did it take? It took a while. Weather, coldness.

Final cost: $1,099 total.

Time: 12 hours for the OSB plus 2 hours for house wrap.